Healthcare

Autumn Hills Care Center – Niles, OH

 

____________________________________________________________________________________________________

 

Glenellen Assisted Living Facility – North Lima, OH

DESCRIPTION:
The Project included the construction of a 46,175 square foot, three-story assisted living facility for Lakeside Manor, Inc.. The facility includes 63 apartments, several dining and activity areas, staff offices, commercial kitchen and laundry facilities, and other common areas.

STRUCTURAL SYSTEM:
The structural system consists of a wood frame system on spread footings with masonry veneer at the walls and a shingled roof. Mike Coates Construction Co., Inc. was responsible for all construction trades.

 

____________________________________________________________________________________________________

 

Hospice of the Valley – Poland, OH

____________________________________________________________________________________________________

 

Kidney Dialysis Center – Youngstown, OH

DESCRIPTION:
The Project included new construction of 26,500 square feet and the renovation of space within the existing structure. New construction added dialysis treatment rooms, examination rooms, a training room, a guardhouse and various staff offices.

STRUCTURAL SYSTEM:
The structural system consists of structural steel and masonry. Mike Coates Construction Co., Inc. was responsible for all construction trades.

 

____________________________________________________________________________________________________

 

Northcoast Behavioral Healthcare Campus Consolidation Phase 2 – Northfield, OH

 

____________________________________________________________________________________________________

 

Salem Community Hospital Surgery Center – Salem, OH

 

____________________________________________________________________________________________________

 

St. Elizabeth Materials Service Center and Intensive Care – Youngstown, OH

DESCRIPTION:
Phase 1 – A 44,000 square foot, two-story, below-grade structure houses prep and clean work rooms, sterilization areas, distribution stores, sterile stores, receiving and decontamination, cart holding and staging, mechanical and electrical rooms, and related areas.
Phase II – A 44,000 square foot, two-story structure constructed atop Phase 1 houses twelve surgical intensive care units, ten coronary surgical care units and related offices.

STRUCTURAL SYSTEM:
Phase 1 – Reinforced, cast-in-place concrete walls and floors; EPDM roof system
Phase II – Reinforced, cast-in-place concrete walls and floors; structural studs with masonry veneer; EPDM roof systemMike Coates Construction performed General Trades for Phase 1- (Perkins & Will Architects/Engineers, Washington, D.C.) and all Trades for Phase II (Hanahan/Strollo & Associates, Inc., Youngstown, Ohio)

 

____________________________________________________________________________________________________

 

St. Elizabeth 6th Floor Build-Out – Boarmdan, OH

 

____________________________________________________________________________________________________

 

St. Elizabeth New Ambulatory Surgery Center – Youngstown, OH

DESCRIPTION:
The project included the construction of a 72,000 square foot, three-story structure which contains eight operating rooms, related recovery rooms, lobbies, and offices.

STRUCTURAL SYSTEM:
The structural system is comprised of structural steel and masonry, and an EPDM roof system. Mike Coates Construction Co., Inc. was responsible for all trades. Architect: Hanahan/Strollo & Associates, Inc

 

____________________________________________________________________________________________________

 

St. Elizabeth South Addition – Youngstown, OH

  ____________________________________________________________________________________________________

 

St. Joeseph Hospital – Warren, OH

 

____________________________________________________________________________________________________

 

The Manor Assisted Living Facility – Niles, OH

DESCRIPTION:
The Project included the construction of a 33,330 square foot, two-story assisted living facility. The facility includes 50 apartments, three dining areas, commercial kitchen and laundry facilities, a salon, various multi-purpose rooms, staff offices and other common areas.

STRUCTURAL SYSTEM:
The structural system consists of wood framing with siding and masonry veneer, and wood roof trusses with shingles. Mike Coates Construction Co., Inc. was responsible for all construction trades.

____________________________________________________________________________________________________

 

Trumbull Memorial Hospital Radiology Center – Cortland, OH

DESCRIPTION:
This Project for Trumbull Memorial Hospital included the construction of a 20,220 square foot, one-story facility to house a M.R.I. Room, a R/F Room, a CT Scan Room, a RAD Room, and related office and patient space. A connector linked the new facility to the existing TMH Center for Surgery. The Project also included an exterior plaza and parking.

STRUCTURAL SYSTEM:
The structural system consists of load bearing metal studs with masonry veneer. Mike Coates Construction Co., Inc. was responsible for all construction trades.

 